How commercial fit-out approval works in Dubai

On a commercial unit there are two approvals, not one: the landlord reviews the design, and the authority inspects what was built.

Open office floor with workstations, glass partitions and a suspended ceiling

The landlord or mall reviews the design before work starts, because a fit-out changes the building: the ceiling layout, the services, the fire strategy, the loading on the floor and the frontage. In a mall the guidelines can be extensive, covering everything from approved working hours to the material of the shopfront and the position of signage.

Approval guidance explains who has a say over the work, what they usually ask to see, and how to keep a decision from becoming the reason a start date slips.

After the landlord there is a second stage. Alterations to sprinklers, smoke detection, ventilation and the electrical supply normally have to be inspected and recorded before the unit can be occupied, and the record of what was actually installed matters when the unit is later handed back.

What matters most on this page

  • Design review by the landlord

    Drawings, specifications and often a method statement are submitted before a start date is agreed. Comments are normal; incomplete submissions are not.

  • Contractor and access approval

    Many buildings keep a list of contractors permitted to work there, and require gate passes, hoarding and insurance documents.

  • Inspection of the alterations

    Fire, life-safety and ventilation changes are inspected rather than assumed, and the sign-off belongs in the programme.

What the approval process will ask of you

  • Drawings that match what will be built

    Layout, reflected ceiling plan, services routes, fire strategy and signage. Changes after approval usually need re-submission.

  • A programme and a method statement

    When the work happens, what happens noisily, where materials are stored and how the area around the unit is protected.

  • Close-out documentation

    As-built drawings and test records for the altered services. This is what protects the deposit and the handover later.

Before you sign the lease or the contract

  1. 01

    Read the fit-out guide before designing

    It constrains the design, the materials and the working hours. Designing first and checking later wastes the design.

  2. 02

    Agree who submits and who attends inspections

    Landlord, contractor or a consultant — it has to be named, because the programme depends on it.

  3. 03

    Confirm the handover condition at the end of the lease

    Reinstatement obligations are agreed at the start and cost real money later if they are ignored now.

Questions we are often asked

Can a fit-out contractor work in a mall outside mall hours?

Often that is the only permitted option, which changes the labour planning rather than the scope. It belongs in the programme and the price.

Do I need an architect or engineer for the submission?

Many landlords require drawings prepared or endorsed by a qualified professional, particularly for services and structural changes.

What if the fit-out changes after approval?

It is re-submitted. That is why variations are cheaper before the approval than after it.

Tell us about the property

Tell us where the property is and what you want to change. We will say what the review is likely to cover before the scope is fixed.

Next step

Check the guidelines before you commit

Send the unit details and the landlord fit-out guide. We will tell you what has to be submitted and when it has to be lodged.