Skip to content
Makan Al Najah

Guides

Renovating an older villa

An older villa has a history that is not on any drawing. The renovation goes better when that history is uncovered early.

Contemporary stone-clad villa with palms and a covered car port

Older villas have often been altered several times: rooms extended, kitchens moved, bathrooms added, AC replaced and wiring extended by different contractors. Some of that work is neat and recorded; some is not. A renovation that assumes the original drawings are accurate can run into a hidden pipe, an extra wall or a cable joint buried in plaster.

Element pages explain one part of a larger renovation in detail: what is being chosen, what the installation involves, and where the cost and time usually sit.

The way to reduce surprises is to look before pricing the whole scope. That may mean opening small inspection points in floors, walls or ceilings where the most important questions sit — under the kitchen, behind a bathroom, at the distribution board — so the quote reflects what is actually there rather than a guess with a large contingency.

What matters most on this page

  • Assume undocumented changes

    Previous owners may have altered services or walls without updating drawings.

  • Open up where it matters

    Small inspection openings at key points reduce the unknowns before the price is fixed.

  • Plan for what ageing services need

    Pipes, valves and wiring nearing the end of their life are better replaced while the house is open.

What older villas commonly reveal

  • Extended circuits

    Circuits added over the years without the board being updated, sometimes overloaded or poorly joined.

  • Mixed pipework

    Repairs in different materials, corroded fittings or valves that no longer close properly.

  • Hidden damp

    Old leaks behind bathrooms or under kitchens, visible only when finishes are removed.

Before pricing an older villa

  • Gather what history you have

    Any drawings, previous contractor details or community records of past alterations.

  • Agree inspection openings

    Where they will be made and how they will be closed if the project does not proceed.

  • Ask how unknowns are priced

    Provisional items should be clearly marked and explained, not hidden in a lump sum.

Questions we are often asked

Why not just price from the drawings?

Drawings for older villas often do not show later changes. Pricing from them alone usually means bigger variations later.

Is an older villa worth renovating?

Often yes — older communities can have larger plots and mature landscaping. The survey shows how much hidden work comes with it.

What if something unexpected is found mid-way?

It is recorded, explained and priced before the work continues, so the decision stays with you.

Tell us about the property

Tell us which room, which element and what is being replaced. We will confirm the measurements and the sequence that follows.

Next step

Start with an honest survey

Tell us roughly when the villa was built and what has changed since. We will plan where to look before pricing the renovation.

Call usWhatsApp