Guides
Fitting out office washrooms
Office washrooms are used all day by many people. Durability, ventilation and cleaning access matter more than anything decorative.

In many office buildings the washrooms sit in the core and are provided by the landlord; in others, tenants fit out their own, connecting to drainage and water points the base build provides. Either way, the layout is tied to those connection points, and an upgrade usually works within the existing positions rather than moving them.
Element pages explain one part of a larger renovation in detail: what is being chosen, what the installation involves, and where the cost and time usually sit.
The finishes have to cope with constant use and frequent cleaning. Cubicle systems, wall-hung fittings that let floors be cleaned underneath, hard-wearing surfaces and good extraction keep a washroom pleasant. Accessibility requirements may also apply to at least one facility, depending on the building.
What matters most on this page
Work to the connections
Layouts follow the base-build drainage and water points.
Easy to clean
Wall-hung fittings and continuous surfaces reduce corners where dirt collects.
Strong extraction
Washrooms need effective, continuous extraction to stay fresh.
Washroom elements
Cubicle systems
Compact laminate or similar panels resist moisture and impact, with robust hardware.
Vanity tops
Solid surface or stone with integrated or undermounted basins, sized for the number of users.
Accessible facility
Where required, a washroom with the space, fittings and rails for wheelchair users.
Before the washroom design
Confirm who provides washrooms
Landlord core facilities or tenant fit-out.
Locate the connection points
From the base-build drawings.
Check accessibility needs
Building and authority requirements for accessible facilities.
Questions we are often asked
Can we add a washroom inside our office?
Only where drainage connections are available. The landlord’s drawings show where that is possible.
Why do our washrooms smell?
Often weak extraction or dry traps in rarely used floor drains. Both can be addressed in a fit-out.
Are sensor taps worth it?
They reduce water use and touching, but need power or batteries and occasional maintenance.
How many washroom fittings do we need?
It depends on headcount and the building or authority requirements. The landlord’s base-build design usually states the occupancy the core facilities were planned for.
Related guides
- Office flooringThe next component to decide in the same room.
- Retail shopfront fit outThe next component to decide in the same room.
- Gypsum vs grid ceilings for officesA choice that shapes how this element is built.
- Commercial fit out costHow this element sits in the overall budget.
Start from commercial fit-out, browse the guides, or see all renovation and fit-out services. We work on homes and commercial premises across Dubai.
Tell us about the property
Tell us which room, which element and what is being replaced. We will confirm the measurements and the sequence that follows.
Phone
+971 58 846 4007Good for talking a job through and arranging a visit.
WhatsApp
Send a messageUseful for photographs, floor plans and measurements.
Next step
Plan washrooms around the base build
Send the floor plan with the washroom area. We will check the connections and suggest a layout and finishes for heavy use.