Fixed-price and remeasured contracts

A fixed price gives certainty for a defined scope. A remeasured contract pays for what is actually done. The scope decides which fits.

Floor plan drawing with a tape measure and pen, ready for a site survey

Under a fixed-price (lump-sum) agreement, the contractor prices a defined scope for a set amount. The client gains cost certainty, provided the scope does not change. The contractor carries the risk of quantities within that scope, which may be reflected in the price.

Comparison guides set real options side by side and say when each one suits, rather than naming a winner for every home.

Under a remeasured approach, rates are agreed and the final cost is based on measured quantities of work done. It suits projects where quantities are uncertain — such as older properties or hidden conditions — but the final cost is less certain at the start. Many renovations combine both: fixed for the known scope and remeasured or provisional for the unknowns.

What matters most on this page

  • Certainty versus flexibility

    Fixed price offers certainty; remeasurement handles uncertainty.

  • Who carries quantity risk

    The contractor under fixed price; the client under remeasurement.

  • Clear scope is essential

    Fixed prices depend on a well-defined scope.

Practical considerations

  • Provisional sums

    Allowances for undefined items, adjusted once the work is known.

  • Variations

    Changes to scope priced separately under either approach.

  • Measurement

    Remeasured work needs agreed measurement and records.

Before agreeing terms

  • Define the scope

    Drawings and specifications for what is included.

  • Identify unknowns

    Where quantities cannot be confirmed in advance.

  • Agree how changes are priced

    Rates or quotations for variations.

Questions we are often asked

Is a fixed price always fixed?

It is fixed for the defined scope. Changes or unforeseen conditions can still lead to variations.

Are remeasured contracts riskier?

For the client, the final cost is less certain, but the price reflects actual work.

Can both be combined?

Yes. Fixed for known work and remeasured for uncertain items is common.

How are provisional sums settled?

Once the item is defined or measured, the actual cost replaces the allowance, and the difference is added or deducted.

Tell us about the property

Tell us which options you are weighing and the room they are for. We will say which one the existing structure and services actually allow.

Next step

Choose terms that suit your scope

Tell us about the project and what is uncertain. We will explain how we would price it.