Materials are not chosen for a mood board. They are chosen in the order the programme needs them, and each one has a date.

Kitchen with a fluted island, white cabinetry and a dark stone splashback

The sequence of a renovation decides the sequence of your choices. Anything that has to be made to order — joinery, stone, some imported tiles — must be decided long before it appears, because production sits between the decision and the installation. Anything bought off the shelf can be decided later, but not after the substrate has been prepared around a different size.

Decision guides set out how to judge a quote, a programme or a contractor fairly, so the comparison is made on like-for-like information.

The practical way to manage it is a finish schedule: one list, with each item, its location, its lead time and the date by which it must be decided. It sounds bureaucratic and it saves an enormous amount of friction, because it turns "we still need to choose tiles" into a date that everyone can see.

What matters most on this page

  • Order follows the programme

    Decide what has to be made first, then what has to be installed, then what is only a finish.

  • Lead time is part of the decision

    An imported tile with a long lead time is a programme decision as much as a design one, and it should be taken first.

  • Approve samples, not screens

    Colour, texture and batch vary. A physical sample under the room lighting is the only reliable approval.

What to decide and when

  • Before first fix

    Sanitaryware, shower types, appliance models and anything that determines pipe, waste and cable positions.

  • Before finishes start

    Tiles, stone, flooring, paint colours and joinery finishes. All of them affect the substrate and the sequence.

  • Late, but not too late

    Light fittings, hardware and accessories can follow, provided the switching and fixing points were already decided.

Keep a finish schedule

  • One list, one owner

    Every material, its location, its lead time and its decision date, with one person responsible for keeping it current.

  • Approve physical samples

    Sign off a sample on site, in the room, before the order is placed.

  • Check what is in stock

    Confirm availability at order rather than at installation, especially for tiles that may need a later top-up from the same batch.

Questions we are often asked

How early should tiles be chosen?

Before the floor and the substrate are prepared, so the build-up, the falls and the setting-out are designed around the tile rather than the other way round.

Does an imported tile take longer?

Usually — production and shipping sit between the order and the delivery. That has to be shown on the programme, not assumed.

Can materials be changed during the work?

Before the substrate is prepared, usually at a modest cost. Afterwards, the change costs the work that was already done around the previous choice.

Tell us about the property

Tell us what you are deciding between and what you have been given so far. We will tell you what is worth checking next.

Next step

Build a finish schedule with us

Tell us the rooms and the look you want. We will set out the decisions in the order the work needs them.